deutsche Version

 

current trackmaps

  • Current tramway trackmap

    Complete tracknetwork of the Holding Graz.

  • share

  • Copyright

    These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.

  • weitere Pläne


    • 01.11.2018
      Plans for the new line to Reininghaus added, Construction works at Mariatrost finished.
    • 01.04.2018
      Route conversion in Mariatrost added.
    • 30.09.2017
      Line to Mariatrost reconstructed, Stop Brauquartier in use.
    • 12.07.2017
      Depot added and several current changes
    • 09.09.2016
      Streckenverlängerung zum Klnikum Nord in Betrieb.
    • 07.06.2016
      Mehrere Korrekturen, danke für die Hinweise.

    profile

    network data
    inauguration:
    08.07.1878
    track gauge:
    1435 mm
    overhead wiring:
    600 VDC
    operator:
    Holding Graz Linien
    network, total length:
    33,5 km
    rolling stock (2016)
    trams:
    66
    maintenance cars:
    8
    historic trams:
    15

    external maps

    Transit map

    On the website of Holding Graz.
    map

    Found a mistake?

    You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

    Updates of the maps will be done about every month. You will get a message when the update is done.

    contact form

    via e-mail:

    gleisplan@web.de

    Home    All maps    Trackmaplist    Links    Legal Notice    Data Privacy Policy    Software