
current trackmaps
Current tramway trackmap
Complete trackmap of the SWA.

Copyright

These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
weitere Pläne
- 29.09.2019
Line to Königsbrunn under construction. - 02.02.2019
Several stops renamed. - 31.03.2018
Several stops renamed. - 16.06.2017
Planned line to Königsbrunn added. - 05.02.2016
Zahlreiche Haltestellen umbenannt. Danke für den Hinweis. - 26.08.2015
Unterführung Hauptbahnhof korrigiert. Danke für den Hinweis.
profile
| network data tramway | |
inauguration: | 08.05.1881 |
track gauge: | 1000 mm |
overhead wiring: | 600 VDC |
operator: | Augsburger Verkehrsgesellschaft (AVG) |
network, total length: | 40,6 km |
| rolling stock (2012) | |
trams: | 70 |
trams withdrawn from use: | 20 |
trailers withdrawn from use: | 16 |
historic trams: | 1 |
| units needed for regular service | |
regular service: | 75 |
during reconstruction of Königsplatz: | 40 |
| partly estimated | |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de
deutsche Version

