deutsche Version

 

current trackmaps

  • Current trackmap

    Complete track network in Heidelberg and surrounding.

  • share

  • Copyright

    These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.

    • 24.08.2024
      Plans for the proposed Weiblingen yard updated.
    • 26.02.2022
      Reconstruction in Leimen finished.
    • 27.11.2021
      Proposed reconstruction of Rohrbach Süd stop added.
    • 23.10.2021
      operation times updated.
    • 26.07.2021
      Proposed sidings in Wieblingen added,
    • 05.07.2021
      Reconstruction of stop Kirchheimer Straße started.

    profile

    network data light rail
    inauguration:
    1901
    track gauge:
    1000 mm
    overhead wiring:
    750 VDC
    stops:
    63
    operator:
    Rhein-Neckar-Verkehr (RNV)
    network, total length:
    30 km
    rolling stock (2012)
    Mannheim & Ludwigshafen included
    trams:
    184
    units needed for regular service:
    142
    historic trams:
    4
    partly estimated

    external maps

    Transit maps

    On the RNV website
    Plan

    Found a mistake?

    You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

    Updates of the maps will be done about every month. You will get a message when the update is done.

    contact form

    via e-mail:

    gleisplan@web.de

    Home    All maps    Trackmaplist    projects    Links    Legal Notice    Data Privacy Policy    Software