current trackmaps
Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 24.08.2024
Plans for the proposed Weiblingen yard updated. - 26.02.2022
Reconstruction in Leimen finished. - 27.11.2021
Proposed reconstruction of Rohrbach Süd stop added. - 23.10.2021
operation times updated. - 26.07.2021
Proposed sidings in Wieblingen added, - 05.07.2021
Reconstruction of stop Kirchheimer Straße started.
profile
network data light rail | |
inauguration: | 1901 |
track gauge: | 1000 mm |
overhead wiring: | 750 VDC |
stops: | 63 |
operator: | Rhein-Neckar-Verkehr (RNV) |
network, total length: | 30 km |
rolling stock (2012) | |
Mannheim & Ludwigshafen included | |
trams: | 184 |
units needed for regular service: | 142 |
historic trams: | 4 |
partly estimated |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de