current trackmaps
Current trackmap
Complete track network in Heidelberg and surrounding.

Copyright

These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 01.04.2020
Start of the construction works at line 23 in Leimen. - 23.09.2019
The reconstruction of the the Hauptbahnhof stop is completed. - 28.08.2019
Line to Leimen Friedhof closed due to track damage. For 2020 a reconstroction of the line is planned, so it will not be repaired until then. - 08.12.2018
New route at Bahnstadt opened. - 04.08.2018
Reconstruction of the Hauptbahnhof Nord stop has begun. - 27.02.2018
Planning for the upcoming reconstruction in Leimen added.
profile
| network data light rail | |
inauguration: | 1901 |
track gauge: | 1000 mm |
overhead wiring: | 750 VDC |
stops: | 63 |
operator: | Rhein-Neckar-Verkehr (RNV) |
network, total length: | 30 km |
| rolling stock (2012) | |
| Mannheim & Ludwigshafen included | |
trams: | 184 |
units needed for regular service: | 142 |
historic trams: | 4 |
| partly estimated | |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de
deutsche Version