current trackmaps
Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
weitere Pläne
- 24.03.2024
New stop Wiesenpark in operation, new parking tracks at the yard. - 16.07.2023
Plans for the new line to Fahrland updated. - 15.04.2022
New loop at Hauptbahnhof in operation. Changes with gthe new timetable. - 07.08.2021
Construction progress at Hauptbahnhof, detailed planning for the the new line to Fahrland added. - 18.06.2021
New track layout at Hauptbahnhof. - 28.08.2019
Reconstruction of the Hauptbahnhof loop added.
profile
network data | |
inauguration: | 12.05.1880 |
track gauge: | 1435 mm |
overhead wiring: | 750 VDC |
operator: | ViP |
network, total length: | 28,9 km |
lines: | 5 + 2 |
line length: | 79,8 km |
rolling stock tramway (2012) | |
trams: | 52 |
historic trams: | 4 |
units needed for regular service: | 33 |
partly estimated |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de