current trackmaps
Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 19.10.2023
Line changes with the new timetable. - 09.07.2018
Planned line to Grombühl added. - 24.02.2018
Trackmap completely revised, planned line to Hubland added. - 26.06.2015
Mehrere kleinere Korrekturen, danke für die Hinweise. - 25.05.2015
Betriebshof Sanderau ergänzt. Danke für die Einsendung. - 30.08.2014
Haltestelle Reuterstraße umgebaut. Danke für die Hinweise.
profile
network data | |
inauguration: | 08.04.1892 |
track gauge: | 1000 mm |
overhead wiring: | 750 VDC |
operator: | Würzburger Straßenbahn GmbH |
network, total length: | 19,8 km |
stops: | 47 |
rolling stock (2012) | |
trams: | 40 |
units needed for regular service: | 27 |
historic trams: | 2 |
partly estimated |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de