
trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
additional maps
current and upcoming projects
-
Linie 4 nach Langenberg
Neubaustrecke von Tinz nach Langenberg.
Planfeststellungsbeschluss Baubeginn: 2026 | proposed inauguration: noch offen
drawn on the trackmap
Short-time construction works with no effect on the trackmap are not listed here.
network data | |
inauguration: | 22.02.1892 |
track gauge: | 1000 mm |
overhead wiring: | 600 VDC |
operator: | GVB Verkehrs- und Betriebsgesellschaft mbH |
network, total length: | 18,8 km |
stops: | 40 |
lines: | 3 |
rolling stock (2012) | |
trams: | 40 |
units needed for regular service: | 23 |
historic trams: | 5 |
partly estimated |
- 24.08.2024
Proposed new line to Langenberg added. - 29.08.2019
Construction works at Wiesestraße added. - 30.09.2017
New names for some stops. - 13.10.2013
- 12.06.2013
- 27.01.2013
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
Contact form
via e-mail:
gleisplan@web.de