current trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 12.02.2024
Construction works at the Elster bridge added. - 05.08.2020
New line network, valid from 08.08.2020. - 17.01.2020
Operation times added. - 09.10.2015
Haltestelle Bahnhof Mitte in Betrieb. - 01.05.2014
Haltepunkt Mitte in Bau. - 09.12.2012
Streckensperrung nach Plamag aufgehoben, Linienänderungen zum Fahrplanwechsel.
profile
network data tramway | |
inauguration: | 17.11.1894 |
track gauge: | 1000 mm |
overhead wiring: | 600 VDC |
operator: | Plauener Straßenbahn GmbH |
network, total length: | 16,4 km |
lines: | 5 |
rolling stock (2020) | |
trams: | 24 |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de