trackmaps
Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
additional maps
current and upcoming projects
-
Straßenbahn Himmelreich
Zweigleisiger Ausbau von Flurstraße bis Zwätzen Schleife und von dort Bau einer Neubaustrecke bis Himmelreich. Die Schleife Zwätzen entfällt.
Planfeststellungsbeschluss Baubeginn: 2025 | proposed inauguration: 2027
drawn on the trackmap
Short-time construction works with no effect on the trackmap are not listed here.
network data | |
inauguration: | 06.04.1901 |
operator: | Jenaer Nahverkehr GmbH |
network, total length (2012): | 26,3 km |
track gauge: | 1000 mm |
overhead wiring: | 660 VDC |
stops: | 48 |
rolling stock (2018) | |
trams: | 38 |
units needed for regular service: | 29 |
historic trams: | 5 |
historic trailers: | 3 |
maintanance vehicles: | 3 |
partly estimated |
- 14.04.2023
Plans for the new tram to Himmelreich added. - 03.09.2020
Construction works in Zwätzen finished. - 01.12.2018
In Zwätzen, the expansion of the single-track line, which has been running until 2020, has begun. - 11.03.2018
Plans for the line extension in Zwätzen added. - 10.12.2017
Some line changes. - 13.12.2015
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
Contact form
via e-mail:
gleisplan@web.de