current trackmaps
Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 27.09.2024
New track at Platz der Freiheit. - 24.11.2017
Loop Berliner Platz reconstructed. - 15.07.2017
Construction at Wittenburger Straße finished, operation times added. - 27.02.2015
Bauarbeiten in der Wittenburger Straße ab März. Danke für den Hinweis. - 13.10.2013
Bauarbeiten in der Innenstadt abgeschlossen. - 20.07.2013
Umbau Betriebshof, danke für den Hinweis.
profile
network data | |
inauguration: | 01.12.1908 |
track gauge: | 1435 mm |
overhead wiring: | 600 VDC |
operator: | Nahverkehr Schwerin GmbH |
network, total length: | 22,8 km |
lines: | 4 |
line length: | 40,5 km |
rolling stock (2012) | |
trams: | 30 |
historic trams: | 3 |
units needed for regular service: | 15 |
partly estimated |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de