current trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
weitere Pläne
- 25.03.2023
Several stops renamed. - 26.04.2020
Ridable miniature railway added - 29.10.2019
New stop at Hauptbahnhof (central station) in operation. - 17.10.2017
Plan completely revised, construction at Hauptbahnof updated, operation times added. - 03.01.2016
Zahlreiche Korrekturen, danke für die Hinweise. - 21.09.2013
Fehlender Bahnsteig Madlow ergänzt, danke für den Hinweis.
profile
network data tramway | |
inauguration: | 18.07.1903 |
track gauge: | 1000 mm |
overhead wiring: | 600 VDC |
stops: | 49 |
operator: | Cottbusverkehr |
network, total length (2017): | 20,1 km |
rolling stock (2015) | |
trams: | 21 |
units needed for regular service: | 16 |
partly estimated |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de