current trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 25.08.2024
Plans for the proposed reconstruction of Donaustadion loop added. - 01.10.2022
Track connection Theater removed. - 08.12.2018
New tram line 2 opened. - 05.08.2017
Turning wye Zeitblomstraße added. - 02.12.2015
Plan komplett überarbeitet und Baustellen ergänzt.
profile
network data | |
inauguration: | 15.05.1897 |
track gauge: | 1000 mm |
operator: | Stadtwerke Ulm/Neu-Ulm (SWU) |
network, total length: | 19,1 km |
overhead wiring: | 750 VDC |
stops: | 40 |
rolling stock (2023) | |
trams: | 28 |
historic trams: | 4 |
historic trailer: | 2 |
maintenance vehicles: | 2 |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de