
current trackmaps
Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 28.04.2022
Lichtwiesenbahn inaugurated and changes with the new timetable. - 31.01.2021
Detailled plan for the proposed line to Ludwigshöhviertel added. - 14.11.2020
Planning for the new Ludwigshöhviertel added. - 05.10.2019
Lichtwiesenbahn: New line under construction. - 03.03.2018
Plans for the upcoming renovation of the Bismarckstraße added. - 10.12.2017
New stop Lincolnsiedlung in operation.
profile
network data tramway | |
inauguration: | 25.08.1886 |
begin of electrical operation: | 23.11.1897 |
track gauge: | 1000 mm |
stops: | 75 |
operator: | HEAG mobilo |
network, total length (2012): | 42,0 km |
rolling stock (2012) | |
trams: | 48 |
trailer: | 30 |
historic trams: | 5 |
units needed for regular service: | 39 |
partly estimated |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de