current trackmaps
Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 07.01.2024
Beginn of the construction works for the new city line. - 26.02.2022
Details of Essen 51 added. - 16.05.2021
Construction of a new workshop at Stadmitte depot added. - 04.03.2021
Proposed line through Essern 51 added. - 31.05.2020
Proposed new line and park railway added. - 03.11.2018
Tram stop Abzweig Katernberg reconstructed.
profile
network data tramway | |
inauguration: | 23.08.1893 |
track gauge: | 1000 mm |
overheand line: | 750 VDC |
operator: | Ruhrbahn |
network, total length: | 52,5 km |
rolling stock (2012) | |
trams: | 84 |
historic trams: | 5 |
units needed for regular service: | 72 |
network data light rail | |
Essen - Mülheim | |
inauguration: | 28.05.1977 |
track gauge: | 1435 mm |
overheand line: | 750 VDC |
network, total length: | 21,5 km |
therof in Mülheim: | 5,5 km |
rolling stock (2012) | |
subway cars: | 51 |
therof from Mülheim: | 6 |
units needed for regular service: | 20 |
therof from Mülheim: | 2 |
partly estimated |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de