deutsche Version

 

current trackmaps

  • Current trackmap

    Complete network of the TEC in Charleroi, Fontaine-l'Evêque and Anderlues.

  • share

  • Copyright

    These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.

    • 25.06.2023
      Plans for the M5 updated.
    • 04.03.2023
      New stop Gare Centrale inaugurated.
    • 03.07.2022
      Several former plannings added.
    • 30.11.2021
      Reconstruction of stop Sud added.
    • 17.04.2021
      Plans for the line to Corbeau added.
    • 02.10.2019
      tram stop Jonction reconstructed

    profile

    network data
    inauguration:
    1881
    track gauge:
    1000 mm
    overhead wiring:
    600 VDC
    operator:
    TEC
    network, total length:
    33,4 km
    lines:
    4
    rolling stock (2012)
    trams:
    49
    therof 12 in spare or under reconstruction.
    partly estimated

    external maps

    Found a mistake?

    You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

    Updates of the maps will be done about every month. You will get a message when the update is done.

    contact form

    via e-mail:

    gleisplan@web.de

    Home    All maps    Trackmaplist    projects    Links    Legal Notice    Data Privacy Policy    Software