current trackmaps
Current trackmap
Complete network of the TEC in Charleroi, Fontaine-l'Evêque and Anderlues.
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 25.06.2023
Plans for the M5 updated. - 04.03.2023
New stop Gare Centrale inaugurated. - 03.07.2022
Several former plannings added. - 30.11.2021
Reconstruction of stop Sud added. - 17.04.2021
Plans for the line to Corbeau added. - 02.10.2019
tram stop Jonction reconstructed
profile
network data | |
inauguration: | 1881 |
track gauge: | 1000 mm |
overhead wiring: | 600 VDC |
operator: | TEC |
network, total length: | 33,4 km |
lines: | 4 |
rolling stock (2012) | |
trams: | 49 |
therof 12 in spare or under reconstruction. | |
partly estimated |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de