
current trackmaps
Current trackmap
Complete trackmap of the VAG in Freiburg.

Copyright

These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 12.12.2020
New line to Messe (trade fair) inaugurated. - 11.11.2020
Passing track at Bissierstraße removed. - 02.08.2020
Proposed lines to Littenweiler and Dietenbach added. - 16.03.2019
New line via Rotteckring inaugurated. - 10.12.2017
Construction works at Siegesdenkmal finished, operation times added. - 14.05.2017
New planning for the line to the Messe and some minor changes.
profile
| network data | |
inauguration: | 14.10.1901 |
track gauge: | 1000 mm |
overhead wiring: | 750 VDC |
operator: | Freiburger Verkehrs-AG (VAG) |
network, total length: | 34,7 km |
stops: | 73 |
| rolling stock (2019) | |
trams: | 72 |
historic trams: | 6 |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de
deutsche Version
