deutsche Version

 

current trackmaps

  • Current trackmap

    Complete trackmap of the VAG in Freiburg.

  • share

  • Copyright

    These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.

    • 08.08.2023
      Plans for the new line to Littenweiler updated.
    • 24.06.2023
      New line through Waldkircher Straße inaugurated.
    • 15.04.2022
      Route via Komturstraße decommissioned, Start of the reconstruction of Hornusstraße loop.
    • 01.05.2021
      Begin of the construction works for the new line at Waldkircher Straße.
    • 12.12.2020
      New line to Messe (trade fair) inaugurated.
    • 11.11.2020
      Passing track at Bissierstraße removed.

    profile

    network data
    inauguration:
    14.10.1901
    track gauge:
    1000 mm
    overhead wiring:
    750 VDC
    operator:
    Freiburger Verkehrs-AG (VAG)
    network, total length:
    34,7 km
    stops:
    73
    rolling stock (2019)
    trams:
    72
    historic trams:
    6

    external maps

    Transit map

    on the VAG website
    Plan

    network map

    At Wikipedia
    Plan

    Found a mistake?

    You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

    Updates of the maps will be done about every month. You will get a message when the update is done.

    contact form

    via e-mail:

    gleisplan@web.de

    Home    All maps    Trackmaplist    projects    Links    Legal Notice    Data Privacy Policy    Software