Current tramway trackmap
Complete tracknetwork of the Holding Graz.

Copyright

These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 02.05.2020
Proposed lines added. - 23.02.2020
New lines to Reininghaus an Cool City under construction, Planning for new city line added. - 01.11.2018
Plans for the new line to Reininghaus added, Construction works at Mariatrost finished. - 01.04.2018
Route conversion in Mariatrost added. - 30.09.2017
Line to Mariatrost reconstructed, Stop Brauquartier in use. - 12.07.2017
Depot added and several current changes
profile
| network data | |
inauguration: | 08.07.1878 |
track gauge: | 1435 mm |
overhead wiring: | 600 VDC |
operator: | Holding Graz Linien |
network, total length: | 33,5 km |
| rolling stock (2020) | |
trams: | 85 |
historic trams: | 10 |
historic trailer: | 10 |
historic maintenance cars: | 6 |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de
deutsche Version