current trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 20.07.2024
Plans for the extension of Remise II added. - 01.07.2024
Reconstruction of Remise 3. - 25.06.2023
Reconstruction of loop and stop Wetzelsdorf. - 28.11.2021
New lines to Reininghaus and Smart City in operation. - 03.10.2021
New stop Münzgrabenkirche under construction. - 03.06.2021
Double track expansion between St. Johann and Kroisbach.
profile
network data | |
inauguration: | 08.07.1878 |
track gauge: | 1435 mm |
overhead wiring: | 600 VDC |
operator: | Holding Graz Linien |
network, total length: | 33,5 km |
rolling stock (2020) | |
trams: | 85 |
historic trams: | 10 |
historic trailer: | 10 |
historic maintenance cars: | 6 |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form