Graz 
trackmaps
Graz tramway
Schloßbergbahn
Copyright

These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
current and upcoming projects
-
Remise III
Erweiterung um 4 Abstellgleise, Neubau einer Waschanlage, Umbau der Werkstatthalle.
fertiggestellt | inauguration: 2025
drawn on the trackmap | website -
Hilmteichstraße
1 Zweigleisiger Ausbau zwischen Hilmteich und Mariagrün.
in Bau | proposed inauguration: Ende 2027
drawn on the trackmap | website -
Maintenance Graz Linien
Erweiterung der Remise Steyrergasse um eine Abstell- und Werkstatthalle.
bauvorbereitende Maßnahmen Baubeginn: Anfang 2027 | proposed inauguration: August 2030
drawn on the trackmap | website -
Linie 8
8 Neubaustrecke von Gösting über Roseggerhaus, Andreas-Hofer-Platz und Reininghaus nach Straßgang.
Vorplanung Baubeginn: 2030 | proposed inauguration: 2033
outlined on the trackmap -
St. Johann – Wagnesweg
1 Zweigleisiger Ausbau
geplant | proposed inauguration: noch offen
Short-time construction works with no effect on the trackmap are not listed here.
| network data | |
inauguration: | 08.07.1878 |
track gauge: | 1435 mm |
overhead wiring: | 600 VDC |
operator: | Holding Graz Linien |
network, total length: | 39 km |
| rolling stock (2020) | |
trams: | 85 |
historic trams: | 10 |
historic trailer: | 10 |
historic maintenance cars: | 6 |
- 18.08.2026
Mothballing of several tracks at Remise 1. - 02.12.2025
New route "Neutorklinie" inaugurated. - 22.12.2024
Proposed second track to Mariatrost added. - 20.07.2024
Plans for the extension of Remise II added. - 01.07.2024
Reconstruction of Remise 3. - 25.06.2023
Reconstruction of loop and stop Wetzelsdorf.
Found a mistake?
You have found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
via e-mail:
gleisplan@web.de
deutsche Version