Düsseldorf
with Neuss and Ratingen
trackmaps
Düsseldorf tramway
Düsseldorf light rail
SkyTrain

light rail trackmap 2008
Complete trackmap in the state of January 2008 before the start of the construction works for the new city tunnel.
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
additional maps
Jan-Wellem-Platz
Overview of the many changes in the past.(german only). Trackmaps and photos.to the page
Sportpark Nord / Europaplatz
Situation before the beginning of the reconstruction in August 2006.trackmap
Benrath Bentriebshof loop
Situation before the beginning of the reconstruction in spring 2009.trackmap
current and upcoming projects
-
Gleiswechsel Lohausen
Bau eines stumpfen Gleiswechsels nördlich der Haltestelle Lohausen als Ersatz für den entfallenden Gleiswechsel am Freiligrathplatz.
geplant | proposed inauguration: noch offen
drawn on the trackmap -
U81
Neubaustrecke vom Flughafen über Stockum und Lörick zum Handweiser.
drawn on the trackmap | website-
1. BA: 1,9 km Neubaustrecke für die Linie 81 vom Freiligrathplatz bis zum Flughafenterminal.
in Bau | proposed inauguration: Mitte 2025 -
2. BA: 5 km Neubaustrecke von der Messe bis zum Handweiser mit neuer Rheinquerung.
Trassenfindung Baubeginn: 2030 | proposed inauguration: 2035 -
3. BA: 3 km Neubaustrecke vom Flughafenterminal bis zum Flughafenbahnhof.
Vorplanung | proposed inauguration: noch offen -
4. BA: Neubaustrecke ab Flughafenbahnhof bis zum Bahnhof Ratingen West
Vorplanung | proposed inauguration: noch offen
-
-
Prinzenallee
Bau eines Hochflur-Mittelbahnsteigs. Dabei entfällt die Verbindungskurve aus Richtung Am Seestern.
in Bau Baubeginn: Juli 2024 | proposed inauguration: 10.06.2025
drawn on the trackmap -
U80
Ausbau der Strecke Ergo-Platz – Reeser Platz und Neubau von dort zur Merkur Spiel-Arena.
Trassenfindung | proposed inauguration: noch offen
outlined on the trackmap | website -
Merziger Straße
Bau von Niederflurbahnsteigen an den Haltestellen Merziger Straße und Straßburgwer Straße (Ausstieg).
geplant | proposed inauguration: Sommer 2025
drawn on the trackmap -
Flingern S
Bau eines Niederflurbahnsteigs in der Birkenstraße.
geplant | proposed inauguration: noch offen
drawn on the trackmap
Short-time construction works with no effect on the trackmap are not listed here.
network data tramway & light rail | |
inauguration: | 06.02.1876 |
track gauge: | 1435 mm |
overhead wiring: | 750 VDC |
operator: | Rheinbahn |
network, total length: | 146,6 km |
rolling stock (2024) | |
trams: | 99 |
metro cars: | 267 |
historic trams: | 15 |
historic trailer: | 5 |
units needed for regular service | |
Rheinbahn: | 176 |
DVG (Duisburg): | 8 |
(lines U71 - U79 / U83 with double units) | |
network data Sky-Train | |
inauguration: | 01.07.2002 |
operator: | Siemens |
network, total length: | 2,5 km |
rolling stock (2012) | |
double units: | 7 |
units needed for regular service: | 3 |
partly estimated |
- 06.01.2024
New line network. - 29.07.2022
Reconstruction of the sidings Am Steinberg. - 28.06.2020
Airport connection under construction. - 23.11.2019
Cripple sidings at Unterrath removed. - 22.09.2019
New platform at tramstop Auf'm Hennekamp. - 13.07.2019
High level platforms Luegplatz in operation.
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
Contact form
via e-mail:
gleisplan@web.de