current trackmaps
Current light rail trackmap
Complete trackmap of the Rheinbahn in Düsseldorf, Neuss and Ratingen and of the SkyTrain.
light rail trackmap 2008
Complete trackmap in the state of January 2008 before the start of the construction works for the new city tunnel.
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
weitere Pläne
Jan-Wellem-Platz
Overview of the many changes in the past.(german only). Trackmaps and photos.to the page
Sportpark Nord / Europaplatz
Situation before the beginning of the reconstruction in August 2006.trackmap
Benrath Bentriebshof loop
Situation before the beginning of the reconstruction in spring 2009.trackmap
- 06.01.2024
New line network. - 29.07.2022
Reconstruction of the sidings Am Steinberg. - 28.06.2020
Airport connection under construction. - 23.11.2019
Cripple sidings at Unterrath removed. - 22.09.2019
New platform at tramstop Auf'm Hennekamp. - 13.07.2019
High level platforms Luegplatz in operation.
profile
network data tramway & light rail | |
inauguration: | 06.02.1876 |
track gauge: | 1435 mm |
overhead wiring: | 750 VDC |
operator: | Rheinbahn |
network, total length: | 146,6 km |
rolling stock (2024) | |
trams: | 99 |
metro cars: | 267 |
historic trams: | 15 |
historic trailer: | 5 |
units needed for regular service | |
Rheinbahn: | 176 |
DVG (Duisburg): | 8 |
(lines U71 - U79 / U83 with double units) | |
network data Sky-Train | |
inauguration: | 01.07.2002 |
operator: | Siemens |
network, total length: | 2,5 km |
rolling stock (2012) | |
double units: | 7 |
units needed for regular service: | 3 |
partly estimated |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de