deutsche Version

 

current trackmaps

  • Current trackmap

    Complete trackmap of the HOCHBAHN.

  • share

  • Copyright

    These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.

    • 15.05.2023
      New line U5 under construction.
    • 01.03.2021
      Start of construction works for the new line to Horner Geest.
    • 26.11.2020
      New yard in Billstedt in operation.
    • 08.12.2019
      New station Oldenfelde inaugurated.
    • 26.11.2019
      Plans for the proposed line U5 added.
    • 08.12.2018
      U4 extension and new stop Elbbrücken in operation.

    profile

    network data
    inauguration:
    15.02.1912
    track gauge:
    1435 mm
    third rail:
    750 VDC
    operator:
    HOCHBAHN
    network, total length:
    104,7 km
    rolling stock (2012)
    metro cars:
    209
    historic metros:
    6
    units needed for regular service:
    79
    partly estimated

    external maps

    transit maps

    On the HVV website.
    Plan

    historical network map

    at Wikipediaextern
    Plan

    Found a mistake?

    You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

    Updates of the maps will be done about every month. You will get a message when the update is done.

    contact form

    via e-mail:

    gleisplan@web.de

    Home    All maps    Trackmaplist    projects    Links    Legal Notice    Data Privacy Policy    Software