
current trackmaps
Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 15.05.2023
New line U5 under construction. - 01.03.2021
Start of construction works for the new line to Horner Geest. - 26.11.2020
New yard in Billstedt in operation. - 08.12.2019
New station Oldenfelde inaugurated. - 26.11.2019
Plans for the proposed line U5 added. - 08.12.2018
U4 extension and new stop Elbbrücken in operation.
profile
network data | |
inauguration: | 15.02.1912 |
track gauge: | 1435 mm |
third rail: | 750 VDC |
operator: | HOCHBAHN |
network, total length: | 104,7 km |
rolling stock (2012) | |
metro cars: | 209 |
historic metros: | 6 |
units needed for regular service: | 79 |
partly estimated |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de