current trackmaps
Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 18.08.2024
Plan for the proposed connection at Margarethen added. - 25.12.2023
New line network - 06.04.2023
Plans for the new tram to Letten added. - 23.10.2021
Missing tracks at Ruchheim depot added. - 20.10.2021
Track construction yard closed, new tramway museum. - 08.10.2020
Proposed tram to Salina Raurica added.
profile
network data | |
inauguration: | 06.05.1895 |
track gauge: | 1000 mm |
overhead wiring: | 600 VDC |
operator: | Basler Verkehrs-Betriebe (BVB) |
: | Baselland Transport AG (BLT) |
network, total length: | 46,6 km |
stops: | 197 |
rolling stock (2012) | |
trams BVB: | 129 |
trailer BVB: | 89 |
trams BLT: | 93 |
therof low-floor: | 8 |
trailer BLT: | 12 |
historic trams: | 12 |
historic trailer: | 11 |
units needed for regular service | |
BVB: | 60 |
BLT: | 53 |
partly estimated |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de