Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 08.04.2020
New Trafford Park Line inaugurated. - 31.03.2018
Heritage tramway at Heaton Park added. - 08.02.2018
New line pattern at timetable change. - 21.05.2017
New trackmap added.
profile
network data tramway | |
inauguration: | 06.04.1992 |
track gauge: | 1435 mm |
overhead wiring: | 750 VDC |
operator: | KeolisAmey Metrolink Ltd. |
owner: | Transport for Greater Manchester |
network, total length: | 101 km |
stops: | 99 |
rolling stock (2023) | |
trams: | 147 |