current trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 06.10.2024
operation times added. - 02.07.2024
New line to north station in operation. - 06.02.2018
New route to the North Station under construction. - 07.06.2016
Neue Haltestelle Norbreck North hinzugefügt. - 20.03.2016
Plan erstellt. Vielen Dank an den Autor.
profile
network data tramway | |
inauguration: | 29.09.1885 |
owner: | Blackpool Council |
operator: | Blackpool Transport |
track gauge: | 1435 mm |
overhead wiring: | 600 VDC |
network, total length: | 17,7 km |
lines: | 1 |
stops: | 37 |
passengers (2015): | 4,1 Mio. |
Rolling Stock (2012) | |
trams: | 31 |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de