current trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 16.07.2024
New line to the stadium inaugurated. - 27.01.2024
Several proposed lines added. - 01.10.2022
New line to Lycée Bouneweg inaugurated. - 06.02.2022
New line to the airport under construction. - 23.04.2021
Current planning for the new line to the stadium added. - 12.12.2020
New line to central station inaugurated.
profile
network data tramway | |
inauguration: | 10.12.2017 |
track gauge: | 1435 mm |
contact line: | 750 VDC |
At the city centre battery operation without contact line. | |
operator: | Luxtram |
network, total length (2017): | 4,6 km |
stops: | 8 |
rolling stock (2017) | |
trams: | 9 |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de