deutsche Version

 

current trackmaps

  • Current tramway trackmap

    Complete network of the Luxtram.

  • share

  • Copyright

    These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.

    • 16.07.2024
      New line to the stadium inaugurated.
    • 27.01.2024
      Several proposed lines added.
    • 01.10.2022
      New line to Lycée Bouneweg inaugurated.
    • 06.02.2022
      New line to the airport under construction.
    • 23.04.2021
      Current planning for the new line to the stadium added.
    • 12.12.2020
      New line to central station inaugurated.

    profile

    network data tramway
    inauguration:
    10.12.2017
    track gauge:
    1435 mm
    contact line:
    750 VDC
    At the city centre battery operation without contact line.
    operator:
    Luxtram
    network, total length (2017):
    4,6 km
    stops:
    8
    rolling stock (2017)
    trams:
    9

    external maps

    tramway network map

    at Wikipedia
    Plan

    Found a mistake?

    You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

    Updates of the maps will be done about every month. You will get a message when the update is done.

    contact form

    via e-mail:

    gleisplan@web.de

    Home    All maps    Trackmaplist    projects    Links    Legal Notice    Data Privacy Policy    Software