trackmaps

  • Current tramway trackmap

    Complete network of the Luxtram.

  • share

  • Copyright

    These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.

  • Ausführliche Definitionen der im Gleisplan verwendeten Symbole und Darstellungen.
  • current and upcoming projects

      Short-time construction works with no effect on the trackmap are not listed here.

    • Flughafen

      Neubaustrecke von Luxexpo bis zum Flughafen
      in Betrieb | inauguration: 02.03.2025
      drawn on the trackmap

    • Kirchberg 2 (K2)

      Neubaustrecke durch den nördlichen Teil von Kirchberg.
      drawn on the trackmap

      • Abschnitt A: Rout Bréck-Pafendall – Laangfur
        geplant Baubeginn: 2025 | proposed inauguration: Ende 2027

      • Abschnitte B & C: Laangfur – Luxexpo
        geplant | proposed inauguration: 2033

    • Betriebshof Cloche d’Or

      Neubau eines Betriebshofs am Stadion.
      geplant Baubeginn: 2025 / 2026 | proposed inauguration: 2029 / 2030

    • Stadion

      Neubaustrecke von Lycée Bouneweg bis zum Stadion.
      drawn on the trackmap

      • Stadion: Strecke
        in Betrieb | inauguration: 07.07.2025

      • Howald Gare: Zweites Gleis am Howald Gare.
        in Bau | proposed inauguration: 2026

    • Hollerich

      Neubaustrecke vom Hauptbahnhof bis Port d’Hollerich.
      geplant Baubeginn: 2027 | proposed inauguration: 2029
      drawn on the trackmap

    • Route d’Esch

      Neubaustrecke von Stäreplaz / Etoile zum Stadion.
      geplant | proposed inauguration: 2030 / 2031
      outlined on the trackmap

    network data tramway
    inauguration:
    10.12.2017
    track gauge:
    1435 mm
    contact line:
    750 VDC
    At the city centre battery operation without contact line.
    operator:
    Luxtram
    network, total length (2017):
    4,6 km
    stops:
    8
    rolling stock (2017)
    trams:
    9
    • 08.03.2025
      New line to the airport inaugurated.
    • 16.07.2024
      New line to the stadium inaugurated.
    • 27.01.2024
      Several proposed lines added.
    • 01.10.2022
      New line to Lycée Bouneweg inaugurated.
    • 06.02.2022
      New line to the airport under construction.
    • 23.04.2021
      Current planning for the new line to the stadium added.

    Found a mistake?

    You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

    Updates of the maps will be done about every month. You will get a message when the update is done.

    Contact form

    via e-mail:

    gleisplan@web.de

    Home    All maps    Trackmaplist    projects    Links    Legal Notice    Data Privacy Policy    Software