
trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
current and upcoming projects
-
Studenski dom ‘Stjepan Radić’
Wiederaufbau der Süd-West-Verbindungskurven
geplant | proposed inauguration: noch offen -
Savišće
Neubaustrecke
geplant | proposed inauguration: noch offen
drawn on the trackmap -
Ranžirni kolodvor
Neubaustrecke
in Bau | proposed inauguration: 2027
drawn on the trackmap
Short-time construction works with no effect on the trackmap are not listed here.
network data | |
inauguration: | 05.09.1891 |
operator: | Zagrebački električni tramvaj (ZET) |
track gauge: | 1000 mm |
network, total length: | 58 km |
contact line: | 600 VDC |
Rolling Stock | |
trams: | 193 |
trailer: | 41 |
- 06.06.2020
New loop at Arena Zagreb in operation. - 27.07.2019
New loop at Arena Zagreb under construction. - 12.07.2018
New trackmap: Zagreb tramway
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
Contact form
via e-mail:
gleisplan@web.de