- 23.02.2024
New stops at Rua Prata. - 05.03.2023
Track connection at Santos under construction. - 23.06.2018
The single track route at São Tomé was replaced by a double track. - 28.04.2018
The 1995 shut down line 24E is back in operation. - 05.01.2018
Map completely revised and updated. - 31.05.2017
Extensive reconstructions in the Corpo Santo area.
profile
network data | |
inauguration: | 17.11.1873 |
operator: | Carris |
track gauge: | 900 mm |
overhead wiring: | 600 VDC |
network, total length: | 25 km |
rolling stock (2017) | |
articulated trams: | 10 |
old trams: | 47 |
therof bi-directional trams: | 2 |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de