current trackmaps
Current light rail trackmap
Complete trackmap of the BOGESTRA in Bochum, Gelsenkirchen an surrounding cities.
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
weitere Pläne
- 31.08.2023
Tail track Laer Mitte mothballed. - 09.01.2023
New line to O-Werk inaugurated. - 20.03.2022
New line to Mark 51°7 completed. The inauguration is scheduled for December 2022. - 17.05.2020
Details of the depots added. - 13.12.2019
Line changes with the new timetable added. - 27.07.2019
Plans for the reconstruction of Bochumer Straße and the new line at the Mark 51°7-area added.
profile
network data tramway | |
inauguration: | 23.11.1894 |
track gauge: | 1000 mm |
overhead wiring: | 750 VDC |
operator: | BOGESTRA |
network, total length: | 84,1 km |
lines: | 6 |
line length: | 109,5 km |
network data light rail (U35) | |
inauguration: | 02.09.1989 |
track gauge: | 1435 mm |
overhead wiring: | 750 VDC |
operator: | BOGESTRA |
network, total length: | 16,5 km |
rolling stock tramway (2012) | |
trams: | 127 |
historic trams: | 4 |
units needed for regular service: | 74 |
rolling stock light rail (2012) | |
light rails: | 31 |
units needed for regular service: | 14 |
partly estimated |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de