Bad Schandau 
Kirnitzschtalbahn
trackmaps
Kirnitzschtalbahn
Copyright

These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
current and upcoming projects
Short-time construction works with no effect on the trackmap are not listed here.
inauguration: | 27.05.1898 |
track gauge: | 1000 mm |
overhead wiring: | 600 VDC |
network, total length: | 7,9 km |
stops: | 10 |
| rolling stock (2012) | |
trams: | 5 |
historic vehicles: | 3 |
units needed for regular service (summer): | 3 |
| partly estimated | |
- 24.03.2026
Map completely revised. - 15.07.2014
- 31.12.2012
- 20.01.2012
Found a mistake?
You have found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
via e-mail:
gleisplan@web.de
deutsche Version