deutsche Version

 

current trackmaps

  • Current trackmap

    Complete network of the CTA and the ATS.

  • share

  • Copyright

    These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.

    • 08.10.2024
      New stop Damen (Lake branch)
    • 09.06.2024
      Construction works for Red Purple Modernization updatet.
    • 17.04.2022
      Airport Transit System: New station added.
    • 02.01.2022
      Several new interlockings and current construction works added, proposed red line extension added.
    • 06.01.2018
      Wilson reconstructed, new station Washington / Wabash in operation.
    • 08.10.2016
      Plan erstellt.

    profile

    network data Chicago Elevated
    inauguration:
    06.06.1892
    operator:
    Chicago Transit Authority (CTA)
    track gauge:
    1435 mm
    third rail:
    600 VDC
    track length:
    360,7 km
    system length:
    165,4 km
    therof elevated:
    57,6 km
    therof subway:
    18,3 km
    stations:
    145
    daily ridership (2015):
    767.730
    Rolling Stock (2016)
    rail cars:
    1492
    network data Airport Transit System
    inauguration:
    06.05.1993
    operator:
    Chicago Airport System
    track gauge:
    1880 mm
    system length:
    4,8 km
    stations:
    5
    Rolling Stock (2022):
    36

    external maps

    Transit maps

    On the CTA website.
    Plan

    Found a mistake?

    You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

    Updates of the maps will be done about every month. You will get a message when the update is done.

    contact form

    via e-mail:

    gleisplan@web.de

    Home    All maps    Trackmaplist    projects    Links    Legal Notice    Data Privacy Policy    Software