current trackmaps
Current tramway network
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
weitere Pläne
- 31.03.2024
Plans for Hauptbahnhof and the new line to Huaptbahnhof added. - 14.12.2019
Route Georgenplatz - Hauptbahnhof abandoned. - 29.07.2018
Trackmap updated and operation times added. - 18.06.2012
Gleisrest am Hauptbahnhof ergänzt, Haltestellen korrigiert. Danke für die Hinweise. - 14.04.2012
Kleinere Korrekturen. Vielen Dank für die Hinweise.
profile
network data | |
inauguration: | 06.05.1894 |
track gauge: | 1000 mm |
partly three-rail-tracks with 1435 mm | |
overhead wiring: | 600 VDC |
operator: | Städtische Verkehrsbetriebe Zwickau (SVZ) |
network, total length: | 20,2 km |
stops: | 40 |
rolling stock (2018) | |
trams: | 32 |
maintanance vehicles: | 1 |
historic trams: | 2 |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de