current trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
weitere Pläne
- 08.09.2024
New Gröpelingen yard inaugurated, - 10.04.2023
New construction of the Zeppelintunnel added. - 05.07.2022
Loop Roland-Center reconstructed. - 06.06.2022
New stop Gröpelingen in operation. - 26.01.2022
New line "Querverbindung Ost" under construction. - 17.07.2021
New line to Mittelshuchting under construction,
profile
network data | |
inauguration: | 04.06.1876 |
track gauge: | 1435 mm |
overhead wiring: | 600 VDC |
operator: | Bremer Straßenbahn AG (BSAG) |
track length: | 190,6 km |
rolling stock (2015) | |
trams: | 119 |
historic trams: | 5 |
historic trailer: | 2 |
external maps
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de