current trackmaps
Current trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 26.07.2023
Regional Connector: New tunnel through the city center inaugurated. - 07.03.2021
New trackmap: Los Angeles Metro Rail
profile
inauguration: | 14.07.1990 |
track gauge: | 1435 mm |
overhead wiring / 3rd rail: | 750 VDC |
network, total length: | ~ 169 km |
stops: | 93 |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de