deutsche Version

 

current trackmaps

  • Current trackmap

    Complete network in Kassel and surrounding.

  • share

  • Copyright

    These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.

  • weitere Pläne

  • network overview

    All routes shown in map and aerial view
    network overview

    Central station

    Situation before the reconstruction 2005.
    trackmap

    • 01.12.2022
      Track crossing in Kaufungen removed.
    • 12.10.2021
      Route Mattenberg - VW-Werk Schleife permanently closed.
    • 25.11.2018
      Several stops accessible reconstructed.
    • 27.03.2018
      Several line changes.
    • 13.05.2017
      Route to VW-Werk Schleife closed.
    • 03.03.2017
      Operation times added and some minor changes.

    profile

    network data
    inauguration:
    09.07.1877
    operator:
    KVG
    network, total length (2012):
    51,2 km
    track gauge:
    1435 mm
    overhead wiring:
    600 VDC
    stops:
    127
    rolling stock (2012)
    trams:
    119
    therof Regio-Trams (600 VDC / 15 kV):
    18
    therof Regio-Trams (600 VDC / Diesel):
    10
    oldtimer trams:
    3
    units needed for regular service:
    82
    therof Regio-Trams (600 VDC / 15 kV):
    14
    therof Regio-Trams (600 VDC / Diesel):
    9
    partly estimated

    external maps

    Transit maps

    On the website of the KVG.
    Plan

    Found a mistake?

    You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

    Updates of the maps will be done about every month. You will get a message when the update is done.

    contact form

    via e-mail:

    gleisplan@web.de

    Home    All maps    Trackmaplist    projects    Links    Legal Notice    Data Privacy Policy    Software