deutsche Version

 

current trackmaps

  • Current trackmap

    Complete track network of the tramway in Norrköping.

  • share

  • Copyright

    These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.

    • 13.04.2021
      Proposed reconstructions at Sandtorp added.
    • 11.11.2020
      Yard remodelled, several stops closed.
    • 02.03.2019
      Trackmap completely revised an operation times added.
    • 16.12.2018
      Depot updated.
    • 09.12.2012
      Kleinere Korrekturen, danke für die Hinweise.
    • 11.11.2012
      Gleisplan erstellt.

    profile

    inauguration:
    10.03.1904
    track gauge:
    1435 mm
    overhead wiring:
    750 VDC
    network, total length:
    18,7 km
    owner:
    Norrköping Rådhus AB
    operator:
    Norrköping Spårvägar AB
    stops:
    50
    rolling stock (2012)
    trams:
    32
    maintenance vehicles:
    4
    historic trams:
    3
    historic trailer:
    3
    units needed for regular service:
    18
    partly estimated

    external maps

    Transit map

    On the website of Östgöta Trafiken.
    Plan

    Found a mistake?

    You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.

    Updates of the maps will be done about every month. You will get a message when the update is done.

    contact form

    via e-mail:

    gleisplan@web.de

    Home    All maps    Trackmaplist    projects    Links    Legal Notice    Data Privacy Policy    Software