
current trackmaps
Current tramway trackmap
Copyright
These drawings are protected by copyright. A further use is possible by application of the Creative-Commons-Lizenz by-nc-sa.
- 27.07.2023
Plans for the new line to Sennestadt updated. - 11.04.2023
Start of the reconstruction of the Hauptstraße in Brackwede. - 02.01.2023
Proposed reconstructions added. - 06.08.2021
Changes at the line network at August 1. - 16.05.2021
High level platform Sieker Mitte in operation. - 28.11.2020
New track connection at Brackwede Bahnhof.
profile
inauguration: | 20.12.1900 |
track gauge: | 1000 mm |
electrification (overhead wiring): | 750 VDC |
network, total length (2012): | 35,6 km |
Rolling Stock (2012) | |
trams: | 80 |
trailers: | 5 |
maintenance and service vehicles: | 2 |
historic trams: | 2 |
units needed for regular service: | 36 |
partly estimated |
Found a mistake?
You've found a mistake in the map or you know a current change? Here you can directly advise it. This will be considered in the next update.
Updates of the maps will be done about every month. You will get a message when the update is done.
contact form
via e-mail:
gleisplan@web.de